Test Installation of Flood Protection in Planá nad Lužnicí

A test installation of the FLOM flood protection system took place in Planá nad Lužnicí, carried out in cooperation with the Integrated Rescue System (IRS) units.

The aim of the event was to verify the speed of installation, system functionality, and readiness for real emergency situations. Firefighters were also involved in the testing, gaining hands‑on experience with handling the barriers and deploying them directly in the field.

Our flood protection systems represent a modern alternative to traditional sandbagging, offering faster installation, higher efficiency, and reusability.

The entire event was also covered by South Bohemian Television, highlighting the growing importance of modern flood protection solutions in real‑world conditions.

No items found.
CAREER